For EPC contractors, incomplete technical documents or non-compliant certification will delay the whole project delivery. This checklist helps you standardize your valve sourcing process.
1. Confirm Technical Specification First
- Design standard: ANSI, API, GB or DIN
- Pressure class, size, end connection (flange / threaded)
- Body & trim material, seat material
- Medium, working temperature
2. Required Certificates & Test Reports
- Material Test Certificate (MTC)
- Hydrostatic test report
- NDT report for high-pressure valves (if required)
- ISO, API certification documents
3. Delivery & Commercial Terms to Confirm
- Lead time, packing standard (export seaworthy packing)
- HS code, CO / Form A certificate for customs clearance
- After-sales warranty period
4. Drawings & Data
2D drawing, installation dimension drawing, operation manual.
Why Work With A Qualified Valve Manufacturer
Huadu Valve provides full set test documents and certification for every export order, to support your project inspection and acceptance.
